Abu Dhabi: Abu Dhabi Airports has announced the early reopening of the Northern Runway (13L/31R) at Zayed International Airport (AUH), which is now fully operational for both arrivals and departures after the completion of a successful rehabilitation project.
The Northern Runway Rehabilitation project introduced several notable improvements. In addition to strengthening and resurfacing the runway with 210,000 tonnes of asphalt for increased durability and resilience, the project incorporated many upgrades.
Key technological upgrades
These advancements include a new redundant ground visibility monitoring system to enhance safety, a state-of-the-art Instrument Landing System (ILS) to boost operational precision, and the replacement of more than 1,200 energy-consuming halogen airfield lights with eco-friendly LED technology.
The shift to LED lighting highlights Abu Dhabi Airports’ commitment to sustainability and environmental stewardship. Meanwhile, the enhancements to essential navigational aids, such as the Instrument Landing System (ILS) and Runway Visual Range (RVR) systems, strengthen both the safety and efficiency of aircraft operations, particularly during adverse weather conditions.
Saif Mohammed Al Suwaidi, Director General of the GCAA, said that, “The successful completion of the North Runway Rehabilitation Project at Zayed International Airport reflects not only the strategic foresight of Abu Dhabi Airports but also the UAE’s dedication to innovation and sustainable growth in the aviation sector. This project reaffirms our commitment to enhancing the global standing of UAE airports, in line with both the GCAA and national vision for long-term prosperity.”
.@ad_airports has marked the early reopening of @AUH’s Northern Runway following a successful rehabilitation project. The runway is fully operational for arrivals and departures. pic.twitter.com/bVnnQ4wYAR
— مكتب أبوظبي الإعلامي (@ADMediaOffice) September 28, 2024
Elena Sorlini, Managing Director and Chief Executive Officer of Abu Dhabi Airports, stated that, “The successful completion of the Northern Runway Rehabilitation Project ahead of schedule is a direct result of meticulous planning, effective stakeholder collaboration, and a steadfast dedication to operational excellence. This enhanced infrastructure will enable us to effectively manage continuous increases in air traffic demand and optimize airport throughput at AUH.”
The project involved advanced technology and high-precision engineering, ensuring that the upgraded runway meets the latest safety and environmental standards. Abu Dhabi Airports’ CEO expressed pride in the team’s accomplishments and highlighted the positive impact this will have on both domestic and international flights.
The reopening of the northern runway is part of the larger development strategy aimed at supporting Abu Dhabi’s Vision 2030, and commitment to advancing aviation infrastructure with a focus on the highest safety and operational standards, further cementing Zayed International Airport’s status as a premier global aviation hub.